A leased line is one of the best investments you can make for your business connectivity — but many companies underestimate how long it can take to install one, and the leased line installation timeline can be quite vague. Don’t worry, understanding the complete leased line installation process, typical lead times and common causes of delay can help you plan better and avoid disruption.

Join us as we explore the leased line installation time UK businesses should expect in 2025.

 

How Long Does Leased Line Installation Take in the UK?

The standard installation timeline for a leased line in 2025 is between 45 and 90 working days from the order date.

However, timelines can vary based on:

  • Location (urban installs are often faster)
  • Network availability
  • Need for civil engineering (digging, ducting)
  • Permissions (wayleave agreements)

 

Typical Stages of a Leased Line Installation Timeline

StageTime EstimateWhat Happens
Order SubmissionDay 0Contract signed and submitted
Desk Survey5-10 working daysInitial check of network feasibility
On-site Survey10-20 working daysEngineer visits premises to assess works
Wayleave Negotiation20-40 working daysPermission sought from landlords if needed
Civil Engineering Works30-60 working daysDigging, laying ducts and fibre
Final Setup and Activation5-10 working daysFibre spliced, router configured, service goes live

Note: Many of these activities can overlap, but any single delay (e.g., wayleave) can halt the entire process.

 

What Causes Leased Line Delays?

1. Wayleave issues

If your leased line installation involves crossing or using private property (for example, if you’re based in an office block), you need a wayleave — a legal permission agreement with the property owner.

Delay potential: High — Landlords can take weeks or months to approve paperwork.

2. Civil engineering works

If fibre ducts or poles aren’t available in your building, Openreach or another network operator must build them. This often means digging pavements or roads and securing local authority permits.

Delay potential: Moderate to High — Road works require council permits; lead times depend on local regulations.

3. Network availability

If you’re based near existing fibre infrastructure, install times are shorter. If not, extensive network extension work may be required.

Delay potential: Moderate

4. Customer site readiness

Delays can also happen if businesses are not prepared internally:

No access to comms rooms

Lack of power points for equipment

Incomplete building works

Delay potential: Low to Moderate

 

UK Providers and Average Installation Times (2025)

ProviderAverage Installation TimeNotes

BT Leased lines

BT Business

60-90 working daysWide national reach but thorough wayleave checks
virgin Media Leased Line
virgin Media Leased Line

Virgin Media Business

50-70 working daysFaster in urban locations

City Fibre

CityFibre (via resellers)

60-80 working daysDependent on regional network availability

TalkTalk Business

TalkTalk Business

55-75 working daysSME-focused, good communication during installs

Vodafone Leased Lines

Vodafone Business

60-90 working daysStrong SLAs once live

Community Fibre

Community Fibre (London only)

30-50 working daysVery quick installs inside London

Remember that timelines may vary depending on the nature of the site and whether additional civil work is required.

How to Speed Up Your Leased Line Installation

  • Start your wayleave early: As soon as you order, speak with your landlord or property manager.
  • Prepare your premises: Make sure network cabinets, power supplies, and access routes are ready for engineers.
  • Work with experienced providers: Choose ISPs who offer dedicated project managers to shepherd the process.
  • Choose pre-lit buildings if possible: Some newer commercial buildings are already fibre-enabled.
  • Communicate clearly: Respond promptly to surveys, paperwork, and installation queries.

What Businesses Should Plan For

  • Backup connectivity: Keep an existing broadband or 4G/5G service active until the leased line goes live.
  • Clear internal timelines: Align your IT teams and office moves with realistic installation expectations.
  • Budget for delays: Always allow a buffer period in your project timelines.

Conclusion – Leased Line Installation Timeline

A leased line is a significant upgrade for any UK business, but installation isn’t instant. In 2025, leased line installation time UK estimates remain 45-90 working days, depending on network access, civil engineering needs, and permissions.

You can significantly reduce the chance of unexpected delays by understanding the full leased line setup 2025 process and acting early on factors like wayleaves and premises readiness.

Planning is essential — and working with experienced, communicative providers will make the journey smoother.

 

Read more about leased lines here:
Leased Line Providers
Best Leased Line Providers
Leased Lines vs Business Broadband
Leased Line Costs
Leased Lines for SMES
Leased Line Installation
Dedicated Leased Line
Leased Line Speeds
Future of Leased Lines
What is a Leased Line
Hidden Costs of Business Leased Lines
Can You Get a Leased Line in Rural Areas
Small Business Leased Line
Leased Line SLAs
Leased Line Alternatives
Leased Line Installation Timeline